One of the major objectives for Data Centers all around the world is to achieve net zero emissions by 2030. Using HVO renewable bio fuel reduces emissions by up to 90% and is becoming the “go to” choice for emergency power generators in the Data Center industry.
Kohler Energy whose name is now rebranded as Rehlko, has completed a great mission to deliver, install and commission 10 generators in containers in one week.
Its Hydrotreated vegetable oil-compatible (HVO) emergency generators was projected by its authorized distributor in Ireland, DE Power, which completed the installation and commissioning of 3 generator consignments to 3 different Data Center customers on 3 different sites – in 1 single week. Additional challenges included working on a small footprint, providing noise suppression and synchronization with the national grid.
The customer required 18Mva of emergency backup power on an extremely small Data Center site. Kohler offered a bespoke solution with 4 x 4500Kva MV containerized generator sets featuring our cutting edge KD103V20 HVO-powered engines from the KD SERIES range. These 4500Kva power node generator sets meant the client could have full emergency backup power from only 4 units – reducing the footprint and saving valuable building space on site.
It provided 2 class leading, cutting edge, KD83V16 HVO-powered engines from the KD SERIES range for this customer. Kohler has been working in partnership with this client for many years throughout the EMEA region and beyond delivering multiple emergency generator power packages across many sites.
It succeeded in supplying the emergency generator power package for this very prestigious Data Center project where only the best equipment from market leading manufactures is allowed on site. Kohler provided 4 x 2500Kva containerized generator sets using class leading HVO-powered engines in bespoke super silenced containers. These generator units synchronize not only with each other but also with the national grid.